Jacket and Monopile Engineering Course
Online 300-hour course in jacket and monopile engineering. 6 modules covering DNV-ST-0126 Support structures for wind turbines, IEC 61400-3-1 Design requirements for fixed offshore wind turbines and Bentley SACS. Assigned tutor and open enrolment.
Jacket and Monopile Engineering Course — étudier depuis France
La France dispose d'un secteur naval et offshore structuré, avec des chantiers militaires et civils, des acteurs de l'énergie en mer et une filière nautique de loisir importante. Naval Group, les chantiers de Saint-Nazaire, Brest et Lorient, ainsi que les entreprises de l'éolien en mer, recrutent des ingénieurs en architecture navale, structure et systèmes. La filière nautique sportive, notamment en Bretagne, Pays de la Loire et Provence, mobilise des compétences en matériaux et hydrodynamique. Les profils doivent maîtriser les normes de sécurité maritime et de classification.
Frais pour France : 448 € (euro), avec mensualités et financement employeur disponibles.
Organismes compétents en France
Postes typiques
Questions depuis France
Quelles instances françaises encadrent les métiers navals et offshore ?
En France, le titre d'ingénieur est encadré par la CTI, et la sécurité maritime relève des autorités de l'État, notamment la direction des affaires maritimes. Les diplômes SEIUM ne sont pas des diplômes d'État ni accrédités nationalement. Leur reconnaissance est laissée à l'appréciation des employeurs et organismes compétents.
Quels débouchés existent en France pour les profils navals, offshore et nautisme sportif ?
Les chantiers navals, les acteurs parapétroliers et offshore, ainsi que l'industrie nautique de loisir et de compétition recrutent des ingénieurs. Un diplôme SEIUM peut enrichir votre profil, mais son poids dépend de chaque recruteur, qui regardera aussi votre expérience et votre projet final.
Comment organiser la charge de travail de cette formation en plus d'un emploi ?
La formation étant en ligne, vous pouvez l'organiser selon vos disponibilités avec l'appui d'un tuteur technique. La charge est indiquée par programme : 300 h, 800 h ou 1 900 h. Le paiement peut être échelonné et un financement par l'employeur est possible. L'anglais technique est nécessaire.
Prenez les commandes.
Réalisez un véritable arbitrage d'ingénierie dans ce domaine. Déplacez les curseurs, observez la réaction du modèle en temps réel et relevez le défi.
Ce que vous serez capable de faire
Select between monopile and jacket according to water depth, soil and wind turbine.
Design piles using p-y and PISA methods based on geotechnical data.
Size a monopile against buckling, natural frequencies and fatigue.
Check tubular jacket joints for strength and fatigue.
Apply DNV, IEC and ISO standards for offshore foundations.
Plan the fabrication, transport and driving of foundations.
Develop the foundation design for an offshore wind turbine.
À qui s'adresse-t-il ?
- Offshore foundations engineer wishing to specialise in Jacket and Monopile Engineering.
- Marine geotechnical engineer wishing to specialise in Jacket and Monopile Engineering.
- Offshore wind structures engineer wishing to specialise in Jacket and Monopile Engineering.
- Heavy steel fabrication engineer wishing to specialise in Jacket and Monopile Engineering.
- Installation engineer wishing to specialise in Jacket and Monopile Engineering.
- Design verifier wishing to specialise in Jacket and Monopile Engineering.
- Graduates in engineering or science seeking to enter offshore wind.
Avec quoi vous travaillerez
- DNV-ST-0126 Support structures for wind turbines
- IEC 61400-3-1 Design requirements for fixed offshore wind turbines
- ISO 19902 Fixed steel offshore structures
- DNV-RP-C203 Fatigue design of offshore steel structures
- API RP 2GEO Geotechnical and foundation design considerations
- ISO 19901-4 Geotechnical and foundation design
- EN 1993-1-6 Eurocode 3: Strength and stability of shell structures
- DNV-RP-B401 Cathodic protection design
6 modules · 300 h
1.1Monopiles, jackets, tripods and gravity-based foundations1.2Evolution towards large-diameter monopiles1.3Jackets for substations and platforms1.4Water depth ranges and soil types1.5Transition piece and connection to the tower1.6Wind turbine loads versus waves1.7Fabrication chain and assembly ports1.8Supply cost per installed megawatt1.9Experience in North Sea wind farms1.10Case study: monopile versus jacket at 45 m
2.1Geotechnical campaigns with CPT and boreholes2.2Design parameters in sands and clays2.3Axial capacity of driven piles2.4p-y curves and the PISA method2.5Rotational stiffness and system frequency2.6Cyclic soil degradation2.7Scour and rock armour protection2.8Drivability and refusal analysis2.9Drilled piles and cement grout2.10Laboratory: p-y curves of a monopile
3.1Diameter, wall thickness and taper3.2Local buckling of shells3.3Target frequencies between 1P and 3P3.4Coupled aerodynamic and hydrodynamic loads3.5Integrated time-domain simulation3.6Bolted connection versus grouted connection3.7Weld details and fatigue categories3.8Cathodic protection and internal corrosion3.9Secondary structures and access platforms3.10Workshop: preliminary sizing of a 10 m monopile
4.1Leg and Bracing Geometry4.2K, T, and Tubular Joints4.3Stress Concentration Factors4.4Joint Fatigue Using Efthymiou Equations4.5Interface with the wind turbine tower4.6Pre-piling versus post-piling4.7Grouted connections at the base4.8Jacket Weight Optimization4.9Serial manufacturing and automated welding4.10Practice: Fatigue Check of a K joint
5.1Rolling and welding of shells5.2Dimensional control and non-destructive testing5.3Float-over and deck transport5.4Jack-up and heavy-lift vessels5.5Driving with hydraulic hammer5.6Underwater noise and bubble curtains5.7Vibratory driving and alternative techniques5.8Verticality and installation tolerances5.9Weather windows and operating criteria5.10Case study: installation sequence of a wind farm
6.1Site and metocean data6.2Selection of foundation type6.3Geotechnical pile design6.4Structural sizing of the foundation6.5Fatigue analysis6.6Fabrication and installation plan6.7Cost estimation6.8Project risk register6.9Rapport et présentation6.10Bilan final avec le tuteur
Comment vous apprendrez
Entièrement 100 % en ligne formation sur le campus SEIUM, avec supports téléchargeables, cours enregistrés et un tuteur technique attitré. No fixed timetable: students progress at their own pace within the intake, which makes it possible to combine with work.
Chaque module associe théorie, lecture guidée de la norme d'origine et exercices appliqués. Le logiciel de travail est Bentley SACS, Plaxis 3D, OpenFAST, DNV Sesam, Abaqus, in free, academic or evaluation versions. The exercises work through real geotechnical design procedures for a monopile, fatigue analysis of tubular joints and pile driving planning. Assessment is continuous per module plus the final integrating project.
Votre projet final suit le flux de travail réel de l'ingénierie, étape par étape, et est évalué par votre tuteur.
Débouchés professionnels
Select between monopile and jacket according to water depth, soil and wind turbine.
Design piles using p-y and PISA methods based on geotechnical data.
Size a monopile against buckling, natural frequencies and fatigue.
Check tubular jacket joints for strength and fatigue.
Apply DNV, IEC and ISO standards for offshore foundations.
Ingénieur de piste pour voitures de tourisme
Prérequis
- No prior degree required.
- Connexion Internet et ordinateur capable de faire fonctionner les logiciels du programme.
- Sufficient level of Spanish to follow technical standards reading.
Prêt à commencer ?
Envoyez votre candidature dès aujourd'hui. Notre équipe d'admissions vous répond sous 72 heures avec votre plan d'études et les options de financement.
Frequently asked questions
The programme comprises 300 hours in total, spread over 3 to 5 months. That is an average of 10 to 15 hours per week, compatible with a full-time job.
You work with Bentley SACS, Plaxis 3D, OpenFAST, DNV Sesam, Abaqus. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.
SEIUM's own diploma upon passing the continuous assessment and the integrating project. It is in-house training, not an official qualification from the Ministry.
Yes. Modules passed in a course or Postgraduate Diploma in the same area are credited towards the advanced programme. Check the credit transfer policy when you enrol.