Master'sOff-Road, Special Vehicles & Machinery Applications open

Master’s in Teleoperation and Remote Centres Engineering

Online master's programme of 1,900 hours in teleoperation and remote operations centre engineering, with 12 modules covering low-latency communications, remote video and perception, operator interfaces, control with time delay, human factors, remote operations centres, functional safety (ISO 13849-1, ISO 17757), cybersecurity (IEC 62443), retrofitting and operation, with an assigned technical tutor.

Duration1900 h
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma

Master’s in Teleoperation and Remote Centres Engineering — studying from South Africa

Mining, agriculture and construction make off-road and specialised machinery central to South Africa's economy. Mining equipment manufacturers and service providers support the country's extensive gold, platinum and coal operations, while agricultural machinery serves commercial farming. Engineers working on heavy vehicles and special machines focus on hydraulics, drivetrains and durability under harsh conditions. The South African Bureau of Standards and the Mine Health and Safety Council set relevant standards and safety requirements.

Fees for South Africa: R 148 000 (South African rand), with instalments and employer sponsorship available.

Relevant bodies in South Africa

  • Mine Health and Safety Council (MHSC)
  • South African Bureau of Standards (SABS)
  • South African Institute of Mining and Metallurgy (SAIMM)

Typical roles

  • Mining Equipment Engineer
  • Off-Road Vehicle Engineer
  • Hydraulics Engineer
  • Heavy Machinery Design Engineer

Questions from South Africa

Will a SEIUM qualification be recognised by the professional bodies in South Africa for this area?

SEIUM qualifications are private and not accredited by any South African body. Engineering registration is handled by ECSA, and machinery safety standards are linked to SABS and the Department of Employment and Labour's regulations. Recognition of a private qualification is decided by employers or the relevant body, so confirm this with them before you enrol.

How might this qualification be used by employers in South Africa in off-road and special vehicles?

Mining, agriculture, construction and vehicle-conversion firms value practical machinery knowledge and proven problem-solving. A private qualification can support your application, especially with hands-on experience, but it carries no official status. Its weight depends on each employer, so ask potential employers in your field how they would view it.

Can I study this programme alongside full-time work from South Africa, and is there a time zone or language issue?

The programme is 100% online and in English, so you can study from home without a student visa. Master's programmes take 1,900 hours, postgraduate diplomas 800 hours and specialist courses 300 hours. Each student has an assigned technical tutor, fees can be paid in instalments, and employer sponsorship is possible. Check time-zone and workload expectations with SEIUM directly.

Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Design teleoperation architectures for machinery.

02

Size low-latency communications.

03

Design ergonomic remote stations.

04

Apply control techniques for time delay.

05

Assess human factors in teleoperation.

06

Ensure functional safety and cybersecurity.

07

Plan remote operations centres.

Profile

Who it's for

  • Teleoperation engineers working on mining, demolition or decommissioning machines.
  • Industrial communications engineers sizing low-latency links.
  • Remote control interface designers focused on operator stations.
  • Human factors specialists assessing workload and situational awareness.
  • Remote operations centre managers planning rooms, shifts and procedures.
  • Industrial cybersecurity engineers protecting remote systems.
  • Engineering or science graduates looking to enter the mining sector.
Standards & tools

What you'll work with

  • UNE-EN ISO 13849-1 (safety of control systems)
  • ISO 17757 (safety of autonomous machines in mining)
  • IEC 62443 (industrial cybersecurity)
  • UNE-EN ISO 11064 (design of control centres)
  • UNE-EN ISO 13850 (emergency stop)
  • Regulation (EU) 2023/1230 (machinery)
  • ROS 2
  • Unity
  • MATLAB/Simulink
  • Wireshark
Syllabus

12 modules · 1900 h

  1. 1.1Historical evolution of teleoperation
  2. 1.2Applications in mining and demolition
  3. 1.3Decommissioning and hazardous environments
  4. 1.4Levels of operator assistance
  5. 1.5Architecture of a teleoperated system
  6. 1.6Safety and productivity benefits
  7. 1.7Current technical limitations
  8. 1.8Industrial application cases
  9. 1.9Regulatory framework for teleoperation
  10. 1.10Case study: teleoperation in a collapse zone
  1. 2.1Communication requirements
  2. 2.2End-to-end latency
  3. 2.3Delay variation (jitter)
  4. 2.4Required bandwidth
  5. 2.5Private LTE and 5G networks
  6. 2.6Industrial Wi-Fi networks
  7. 2.7Satellite links
  8. 2.8Link redundancy
  9. 2.9Quality of service
  10. 2.10Practical: latency budget for a link
  1. 3.1Camera selection and placement
  2. 3.2H.264 and H.265 video encoding
  3. 3.3Video latency
  4. 3.4360-degree views
  5. 3.5Remote stereoscopic vision
  6. 3.6Augmented reality for the operator
  7. 3.7Ambient machine sound
  8. 3.8Sensor data on screen
  9. 3.9Adaptive video quality
  10. 3.10Lab: measuring video latency
  1. 4.1Types of teleoperation stations
  2. 4.2Controls and joysticks
  3. 4.3Displays and layout
  4. 4.4Virtual reality headsets
  5. 4.5Ergonomics of the remote station
  6. 4.6Information shown to the operator
  7. 4.7Alarm management
  8. 4.8Operator-specific customisation
  9. 4.9User-centred design
  10. 4.10Workshop: designing a remote station
  1. 5.1Effect of latency on control
  2. 5.2Supervisory task control
  3. 5.3Predictive motion displays
  4. 5.4Shared control with the machine
  5. 5.5Automatic operator assistance
  6. 5.6Haptic force feedback
  7. 5.7Loop stability with delay
  8. 5.8Passivity-based approaches
  9. 5.9Tests with operators
  10. 5.10Practical: delay compensation
  1. 6.1Operator mental workload
  2. 6.2Remote situational awareness
  3. 6.3Fatigue during long shifts
  4. 6.4Simulator sickness
  5. 6.5Operator selection
  6. 6.6Training programmes
  7. 6.7Shift organisation
  8. 6.8Assessment with NASA-TLX
  9. 6.9Human error in teleoperation
  10. 6.10Case study: workload assessment
  1. 7.1Control room design
  2. 7.2Multiple stations per operator
  3. 7.3Supervision of several machines
  4. 7.4Roles and responsibilities
  5. 7.5Centre operating procedures
  6. 7.6Business continuity
  7. 7.7Centre infrastructure
  8. 7.8Examples of existing centres
  9. 7.9Centre costs
  10. 7.10Case study: design of a remote centre
  1. 8.1Remote emergency stop
  2. 8.2Watchdog supervision
  3. 8.3Reaction to link loss
  4. 8.4ISO 13849 requirements
  5. 8.5ISO 17757 requirements
  6. 8.6Zone access control
  7. 8.7Safety validation
  8. 8.8Risk analysis
  9. 8.9System documentation
  10. 8.10Practical: link-loss analysis
  1. 9.1Threats to remote systems
  2. 9.2Communication encryption
  3. 9.3Operator authentication
  4. 9.4Network segmentation
  5. 9.5IEC 62443 requirements
  6. 9.6Security monitoring
  7. 9.7Incident response
  8. 9.8Security audits
  9. 9.9European regulatory framework
  10. 9.10Lab: secure network architecture
  1. 10.1Commercial teleoperation kits
  2. 10.2Integration with existing machines
  3. 10.3Actuators for controls
  4. 10.4Additional sensors on the machine
  5. 10.5Acceptance testing
  6. 10.6Equipment maintenance
  7. 10.7Supplier selection
  8. 10.8Retrofitting costs
  9. 10.9Retrofitting cases
  10. 10.10Case study: retrofitting an excavator
  1. 11.1Performance indicators
  2. 11.2Productivity compared with local operation
  3. 11.3Continuous operator training
  4. 11.4Shift-based work organisation
  5. 11.5Legal aspects of remote operation
  6. 11.6Insurance and liabilities
  7. 11.7Service contracts
  8. 11.8Scaling up the operation
  9. 11.9Future trends in teleoperation
  10. 11.10Case study: business case for a remote centre
  1. 12.1Definition of machine and mission
  2. 12.2Communication requirements
  3. 12.3Remote station design
  4. 12.4Delay control strategy
  5. 12.5Safety analysis
  6. 12.6System cybersecurity
  7. 12.7Validation plan
  8. 12.8Economic feasibility of the centre
  9. 12.9Thesis report
  10. 12.10Master's Thesis: defence before a panel
Methodology, software & labs

How you'll learn

100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within the intake, so you can combine it with your job.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is ROS 2, Unity, MATLAB/Simulink and Wireshark, in free, academic or evaluation versions. Testing is studied through real procedures for measuring video and control latency, operator workload assessment and link-loss tests. Assessment is continuous by module, plus the final Master's Thesis.

Standards covered: UNE-EN ISO 13849-1, ISO 17757, IEC 62443, UNE-EN ISO 11064, UNE-EN ISO 13850, Regulation (EU) 2023/1230.

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of UNE-EN ISO 13849-1, ISO 17757 and IEC 62443 applied to real cases, not as a theoretical annex.
Industry software:ROS 2, Unity, MATLAB/Simulink and Wireshark, in free, academic or evaluation versions.
Master's Thesis with defence:A complete teleoperation system and remote centre design, from communications and operator station to safety, cybersecurity and economic feasibility, defended before a panel.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Link latency budget
Size the communications link and its latency budget for a machine.
Remote station design
Design an ergonomic operator station and measure video latency.
Delay control and human factors
Apply delay compensation and assess operator workload with NASA-TLX.
Safety and cybersecurity
Analyse link loss and design a secure network architecture.
Master's Thesis
A full teleoperation system and remote centre proposal, defended before a panel.
Career opportunities

Where this takes you

Teleoperation engineerIndustrial communications engineerRemote control interface designerHuman factors specialistRemote operations centre managerIndustrial cybersecurity engineer
Admissions & scholarships

Requirements

  • A university degree in engineering, science or architecture, or equivalent demonstrable professional experience.
  • An internet connection and a computer capable of running the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with ROS 2, Unity, MATLAB/Simulink and Wireshark, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.

A degree in engineering, science or architecture (or equivalent professional experience), a computer able to run the programme software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Master’s in Teleoperation and Remote Centres EngineeringEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.