Master'sEnergy and Networks Applications open

Master’s in Digital Substations (IEC 61850)

Online master's programme of 1,900 hours in digital substations (IEC 61850), 12 modules covering the IEC 61850 data model, SCL engineering, process bus, digital protection and control, substation networks, cybersecurity, testing and commissioning, asset monitoring and new architectures, with an assigned technical tutor.

Duration1,900 hours · 12–14 months
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma

Master’s in Digital Substations (IEC 61850) — studying from South Africa

Energy is a defining sector in South Africa, with Eskom operating the bulk of the national generation and transmission network and independent power producers increasingly contributing renewable capacity. Grid modernisation, renewable integration and distribution management create steady demand for engineers. The National Energy Regulator of South Africa oversees electricity regulation, while municipalities manage local distribution. Energy engineers typically work on generation, transmission, protection and system planning.

Fees for South Africa: R 110 000 (South African rand), with instalments and employer sponsorship available.

Relevant bodies in South Africa

  • National Energy Regulator of South Africa (NERSA)
  • South African Bureau of Standards (SABS)
  • South African Institute of Electrical Engineers (SAIEE)

Typical roles

  • Power Systems Engineer
  • Grid Planning Engineer
  • Protection Engineer
  • Renewable Energy Engineer

Questions from South Africa

Which South African bodies regulate energy and networks engineers, and would SEIUM count?

Energy engineers in South Africa are registered through ECSA, and the electricity sector is regulated by NERSA. Utilities and networks often require registered professionals for certain work. SEIUM is a private online institute, and its qualifications are not official state degrees or accredited by a national body. Recognition is for employers and the relevant body to decide, so verify this before enrolling.

Will this qualification help me find work with energy or network employers in South Africa?

South Africa's energy sector includes Eskom, municipalities, independent power producers and grid-related firms, which typically hire registered and experienced engineers. A private online qualification may support your application but does not guarantee a role. Check with target employers how they view it, and combine it with practical experience where possible.

How do I manage the workload, and can I get help with fees?

The programme is fully online and taught in English, so you need good English, and no student visa is needed to study from home. Master's programmes are 1,900 hours, postgraduate diplomas 800 hours and specialist courses 300 hours, with an assigned technical tutor and a final project. Fees are payable in instalments, and employer sponsorship may be possible, so ask your employer whether they would support the cost.

Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Understand the architecture of digital substations.

02

Apply the IEC 61850 data model.

03

Carry out system engineering with SCL.

04

Design the process bus and the communication network.

05

Implement GOOSE-based protection schemes.

06

Test and commission IEC 61850 systems.

07

Protect digital substations against cyber threats.

Profile

Who it's for

  • Digital substation engineers.
  • Protection and control engineers.
  • IEC 61850 systems engineers.
  • Commissioning engineers.
  • Substation communications engineers.
  • Substation cybersecurity specialists.
  • Engineering or science graduates looking to enter electricity transmission.
Standards & tools

What you'll work with

  • IEC 61850-8-1 (MMS and GOOSE mapping)
  • IEC 61850-9-2 (sampled values over Ethernet)
  • IEC 61850-6 (substation configuration language)
  • IEC 61869-9 (digital interface for instrument transformers)
  • IEC 62351 (power system communication security)
  • IEC 62439-3 (PRP and HSR redundancy)
  • IEC 61850-9-3 (precision time protocol profile)
  • IEC 61850-90-4 (network engineering guidelines)
  • Helinks STS
  • OMICRON StationScout
  • Siemens DIGSI 5
  • Wireshark
  • ABB PCM600
Syllabus

12 modules

  1. 1.1Conventional substation architecture
  2. 1.2Limitations of copper wiring
  3. 1.3The digital substation concept
  4. 1.4Station bus and process bus
  5. 1.5Benefits of digitalisation
  6. 1.6Utility experiences
  7. 1.7Barriers to adoption
  8. 1.8Digitalisation roadmap
  9. 1.9Substation life cycle
  10. 1.10Case study: migration of a 220 kV substation
  1. 2.1Structure of the IEC 61850 series
  2. 2.2Data model and logical nodes
  3. 2.3Abstract communication service interface (ACSI)
  4. 2.4Mapping to MMS
  5. 2.5GOOSE fast messaging
  6. 2.6Sampled values (SV)
  7. 2.7Time synchronisation of devices
  8. 2.8Editions 1, 2 and 2.1
  9. 2.9Conformance tools
  10. 2.10Lab: analysis of an IED data model
  1. 3.1Substation Configuration Language (SCL)
  2. 3.2ICD, SSD, SCD and CID files
  3. 3.3IEC 61850 engineering process
  4. 3.4System configuration tools
  5. 3.5IED configuration tools
  6. 3.6Tool interoperability
  7. 3.7Version management
  8. 3.8Common engineering errors
  9. 3.9System documentation
  10. 3.10Practical: SCD configuration of a bay
  1. 4.1Merging units and digitisation of measurements
  2. 4.2Intelligent circuit breakers and controllers
  3. 4.3Non-conventional instrument transformers
  4. 4.4IEC 61869-9 profile
  5. 4.5Latency and determinism
  6. 4.6SV bandwidth
  7. 4.7Process bus redundancy
  8. 4.8Process bus testing
  9. 4.9Implementation experiences
  10. 4.10Lab: subscribing to sampled values
  1. 5.1IEC 61850 protection relays
  2. 5.2Protection schemes with GOOSE
  3. 5.3GOOSE-based interlocking
  4. 5.4Differential protection with SV
  5. 5.5Substation automation functions
  6. 5.6Bay control
  7. 5.7Substation control system
  8. 5.8Interface with the control centre
  9. 5.9Blocking logic
  10. 5.10Practical: breaker failure scheme with GOOSE
  1. 6.1Network architectures
  2. 6.2PRP and HSR redundancy
  3. 6.3Substation-grade switches
  4. 6.4VLAN and priority
  5. 6.5Requirements of IEC 61850-90-4
  6. 6.6Time synchronisation with PTP
  7. 6.7IEC 61850-9-3 profile
  8. 6.8Network management
  9. 6.9Network testing
  10. 6.10Lab: PRP network with IEDs
  1. 7.1Threats to digital substations
  2. 7.2The IEC 62351 standard
  3. 7.3GOOSE authentication
  4. 7.4Role-based access control
  5. 7.5Network segmentation
  6. 7.6Security monitoring
  7. 7.7IED patch management
  8. 7.8Secure remote access
  9. 7.9Regulatory security requirements
  10. 7.10Workshop: security analysis of a substation
  1. 8.1Testing strategy
  2. 8.2Factory acceptance testing (FAT)
  3. 8.3Site acceptance testing (SAT)
  4. 8.4IEC 61850 test equipment
  5. 8.5Simulation of GOOSE and SV
  6. 8.6Test mode and isolation
  7. 8.7End-to-end testing
  8. 8.8Test documentation
  9. 8.9Phased commissioning
  10. 8.10Practical: protection test with SV injection
  1. 9.1Sensors on high-voltage equipment
  2. 9.2Transformer monitoring
  3. 9.3Circuit breaker monitoring
  4. 9.4Online partial discharge
  5. 9.5Integration into IEC 61850
  6. 9.6Condition monitoring platforms
  7. 9.7Condition-based maintenance
  8. 9.8Asset analytics
  9. 9.9Substation digital twins
  10. 9.10Lab: integrating a transformer monitor
  1. 10.1Operating digital substations
  2. 10.2Configuration management
  3. 10.3IED maintenance
  4. 10.4Equipment replacement
  5. 10.5Firmware management
  6. 10.6Communication diagnostics
  7. 10.7Staff training
  8. 10.8Availability indicators
  9. 10.9Lessons learned in operation
  10. 10.10Case study: replacing an IED in service
  1. 11.1Centralised protection and control
  2. 11.2Virtualised protection
  3. 11.3Software-defined substations
  4. 11.4Edge computing
  5. 11.5Integration with TSN
  6. 11.6IEC 61850 for renewables
  7. 11.7IEC 61850 in distribution
  8. 11.8Multi-vendor interoperability
  9. 11.9Future standardisation work
  10. 11.10Practical: virtualised protection on a server
  1. 12.1Selecting the substation
  2. 12.2Defining functional requirements
  3. 12.3System architecture
  4. 12.4System engineering in SCL
  5. 12.5Network design
  6. 12.6Protection schemes
  7. 12.7Test plan
  8. 12.8Cybersecurity measures
  9. 12.9Master's Thesis report
  10. 12.10Master's Thesis: defence before a panel
Methodology, software & labs

How you'll learn

The programme is delivered 100% online on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within each intake, so it fits around your job.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is Helinks STS, OMICRON StationScout, Siemens DIGSI 5, Wireshark and ABB PCM600, in free, academic or evaluation versions. Testing is studied on real procedures for FAT and SAT of protection systems, GOOSE and SV message simulation and redundant network testing. Assessment is continuous by module plus the final Master's Thesis.

Standards covered: IEC 61850-8-1, IEC 61850-9-2, IEC 61850-6, IEC 61869-9, IEC 62351, IEC 62439-3, IEC 61850-9-3, IEC 61850-90-4.

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of IEC 61850-8-1, IEC 61850-9-2 and IEC 61850-6 applied to real cases, not as a theoretical annex.
Industry software:Helinks STS, OMICRON StationScout, Siemens DIGSI 5, Wireshark and ABB PCM600, in free, academic or evaluation versions.
Master's Thesis with defence:A complete IEC 61850 digital substation design for a real substation, defended before a panel.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Requirements and architecture
Define the functional requirements and the station/process bus architecture.
SCL engineering
Build the SCD file and configure the IEDs of each bay.
Network and protection
Design the PRP/HSR network and the GOOSE-based protection schemes.
Testing and cybersecurity
Draft the FAT/SAT test plan and the IEC 62351 security measures.
Master's Thesis
A complete digital substation design for a real substation, defended before a panel.
Career opportunities

Where this takes you

Digital substation engineerProtection and control engineerIEC 61850 systems engineerCommissioning engineerSubstation communications engineerSubstation cybersecurity specialist
Admissions & scholarships

Requirements

  • University degree in engineering, science or architecture, or equivalent demonstrable professional experience.
  • Internet connection and a computer able to run the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with Helinks STS, OMICRON StationScout, Siemens DIGSI 5, Wireshark and ABB PCM600, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.

A university degree in engineering, science or architecture (or equivalent professional experience), a computer able to run the software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Master’s in Digital Substations (IEC 61850)Enrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.