Postgraduate Diploma in Reclosing, FDIR and Auto-sectionalising
Online Postgraduate Diploma of 800 h in reclosing, FDIR and auto-sectionalising. 8 modules covering IEEE C37.104 (automatic reclosing on distribution and transmission lines), IEC 62271-111 (automatic circuit reclosers) and CYME. Assigned tutor and enrolment open.
Postgraduate Diploma in Reclosing, FDIR and Auto-sectionalising — studying from Singapore
Singapore's energy system is largely based on natural gas, supplemented by growing investment in solar, energy storage and grid modernisation. The Energy Market Authority regulates the electricity and gas markets and oversees network reliability, while SP Group operates the national grid. Engineers work on power systems, distribution networks, energy efficiency and resilience planning. The sector also supports regional energy trading and the petrochemical cluster on Jurong Island.
Fees for Singapore: 1,600 S$ (Singapore dollar), with instalments and employer sponsorship available.
Relevant bodies in Singapore
Typical roles
Questions from Singapore
In what currency are fees shown?
Fees on this site are shown in Singapore dollars (SGD). Instalment plans are available, and some learners explore employer sponsorship.
What does the final project involve?
Each programme concludes with a final project that applies the course material to a practical engineering problem, supported by your technical tutor.
Take the controls.
Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.
What you will be able to do
Describe the architecture of distribution network automation.
Adjust automatic reclosing sequences on overhead lines.
Coordinate sectionalisers with reclosers.
Design centralised and distributed FDIR schemes.
Select communication protocols for automation.
Analyse the impact of distributed generation on protection.
Evaluate improvements in supply continuity indices.
Who it's for
- Distribution automation engineer who wants to specialise in Reclosing, FDIR and Auto-sectionalising.
- FDIR systems specialist who wants to specialise in Reclosing, FDIR and Auto-sectionalising.
- Medium-voltage protection engineer who wants to specialise in Reclosing, FDIR and Auto-sectionalising.
- Telecontrol engineer who wants to specialise in Reclosing, FDIR and Auto-sectionalising.
- Distribution control centre operator who wants to specialise in Reclosing, FDIR and Auto-sectionalising.
- Quality of service engineer who wants to specialise in Reclosing, FDIR and Auto-sectionalising.
- Engineering or science graduates looking to enter electrical distribution.
What you'll work with
- IEEE C37.104 (automatic reclosing on distribution and transmission lines)
- IEC 62271-111 (automatic circuit reclosers)
- IEC 61850 (communications in electrical power system automation)
- IEEE 1815 (DNP3)
- IEC 60870-5-104 (telecontrol over TCP/IP)
- IEEE C37.60 (reclosers and fault interrupters)
- IEEE 1547-2018 (interconnection of distributed resources)
8 modules · 800 h
1.1Radial, meshed and ring topologies1.2Supply quality and SAIDI and SAIFI indices1.3TIEPI and NIEPI in Spanish regulation1.4Fault types in distribution networks1.5Isolated, compensated and solidly earthed neutral1.6Distribution automation architecture1.7Online remote-controlled equipment1.8Control centres and ADMS1.9Cost of energy not supplied1.10Practical case: quality indices of a feeder
2.1Transient nature of overhead line faults2.2Reclosing cycles and dead times2.3Reclosers according to IEEE C37.602.4Fast and slow curves2.5Coordination with fuses: fuse saving and fuse blowing2.6Reclosing blocking on underground cables2.7Single-pole and three-pole reclosing2.8Synchronism check2.9Effects of reclosing on distributed generation2.10Workshop: recloser–fuse coordination
3.1Sectionalisers and pulse counting3.2Sectionalising on loss of voltage3.3Voltage–time logic3.4Automatic loop schemes (loop scheme)3.5Fault passage detectors3.6Directional fault indicators3.7Circuit breaker–recloser–sectionaliser coordination3.8Settings according to network configuration3.9Limitations of local schemes3.10Practice: design of a voltage–time scheme
4.1Real-time fault detection4.2Impedance-based and indicator-based location4.3Automatic isolation of the faulted section4.4Restoration via adjacent feeders4.5Centralised versus distributed FDIR4.6Agent-based and peer-to-peer FDIR4.7Capacity and voltage constraints in restoration4.8Optimal reconfiguration algorithms4.9Operating times and quality of service4.10Laboratory: FDIR simulation in OpenDSS
5.1Communication requirements for FDIR5.2DNP3 and IEC 60870-5-1045.3IEC 61850 and GOOSE messages in distribution5.4Private radio, cellular and fibre5.5Broadband PLC5.6Latency, availability and redundancy5.7Cybersecurity of field equipment5.8Remote device management5.9Integration with SCADA and ADMS5.10Practice: configuration of a DNP3 link
6.1Impact of distributed generation on reclosing6.2Unintentional islanding and anti-islanding6.3Inverter contribution to faults6.4Desensitisation of protections6.5Sympathetic tripping6.6Directional protection in distribution6.7Adaptive settings6.8Connection requirements for distributed generation6.9Coordination with microgrids6.10Practical case: feeder with high PV penetration
7.1Selection of automation points7.2Cost–benefit analysis of automation7.3Reliability models and Monte Carlo simulation7.4Logic testing before deployment7.5Commissioning of reclosers7.6Maintenance of remote-controlled equipment7.7Post-implementation performance indicators7.8Experiences of large distribution utilities7.9Investment plans and incentive regulation7.10Workshop: prioritisation of automation investments
8.1Characterisation of the network under study8.2Fault analysis and historical indicators8.3Reclosing and sectionalising scheme8.4FDIR logic design8.5Communications architecture8.6Simulation of fault scenarios8.7Assessment of quality improvement8.8Implementation plan and costs8.9Report and presentation8.10Final review with the tutor
How you'll learn
100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. No fixed timetables: the student progresses at their own pace within the enrolment period, which makes it compatible with work.
Each module combines theory, guided reading of the original standard and applied exercises. The working software is CYME, OpenDSS, DIgSILENT PowerFactory, SEL AcSELerator QuickSet, Wireshark, in free, academic or evaluation versions. Tests are studied using real simulation procedures for isolation and restoration sequences, coordination of reclosers and sectionalisers, and DNP3 and IEC 61850 communication tests. Assessment is continuous per module plus the final integrative project.
Build it end to end
Your final project follows the real engineering workflow, step by step, reviewed by your tutor.
Describe the architecture of distribution network automation.
Adjust automatic reclosing sequences on overhead lines.
Coordinate sectionalisers with reclosers.
Design centralised and distributed FDIR schemes.
Select communication protocols for automation.
Where this takes you
Requirements
- Prior technical training or professional experience in the sector. No university degree is required.
- Internet connection and a computer capable of running the programme's software.
- Sufficient level of Spanish to follow technical standards reading.
Ready to start?
Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.
Frequently asked questions
The programme consists of 800 hours in total, spread over 6 to 8 months. That is between 10 and 15 hours per week on average, compatible with a full-time job.
You work with CYME, OpenDSS, DIgSILENT PowerFactory, SEL AcSELerator QuickSet, Wireshark. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.
An own diploma from SEIUM upon passing the continuous assessment and the integrative project. It is in-house training, not an official qualification from the Ministry.
Yes. Modules passed in a course or postgraduate diploma in the same area are recognised towards the higher programme. Check the recognition policy when you enrol.
Related programmes
Postgraduate Diploma in Voltage Stability and Power Flow Control
Online 800 h Postgraduate Diploma in Voltage Stability and Power Flow Control. 8 modules covering Regulation (EU) 2017/1485 (system operation), Regulation (EU) 2016/631 (RfG network code)…
Postgraduate Diploma in O&M, CMS and Diagnostics for Wind Turbines
Online 800-hour Postgraduate Diploma in O&M, CMS and Diagnostics for Wind Turbines. 8 modules covering IEC 61400-1 (wind turbine design requirements), ISO 10816-21 (vibration in horizontal-axis…
Postgraduate Diploma in Materials Compatibility and Integrity
Online 800-hour Postgraduate Diploma in Materials Compatibility and Integrity. 8 modules covering ASME B31.12 (hydrogen piping and ducts), ISO 11114-4 (selection of steels resistant to hydrogen…
More in Energy and Networks
All Energy and Networks programmes → · How to apply · Fees & financing · Scholarships