Master'sElectromobility, Batteries & Hydrogen Applications open

Master’s in Grid Planning for e-Mobility Engineering — Impact Studies, DSO/TSO, Flexible Demand

Online master's programme of 1,900 hours in grid planning engineering for e-mobility — impact studies, DSO/TSO and flexible demand. 12 modules covering distribution network modelling, charging demand forecasting, grid impact studies, transmission planning, smart charging, local flexibility markets, investment optimisation, power quality, grid digital twins and regulation, with an assigned technical tutor.

Duration1900 h
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma
Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Model distribution networks for e-mobility studies.

02

Forecast charging demand using probabilistic methods.

03

Assess the impact of charging on distribution and transmission networks.

04

Quantify the flexibility provided by electric vehicle demand.

05

Design local flexibility products and markets.

06

Optimise network investments against flexible solutions.

07

Prepare a complete grid planning study.

Profile

Who it's for

  • Network planning engineers at distribution and transmission companies.
  • Energy flexibility analysts.
  • Grid study engineers carrying out hosting capacity and impact assessments.
  • E-mobility consultants advising cities and CPOs.
  • Energy data analysts working with smart meter and mobility data.
  • Electricity regulation specialists.
  • Engineering or science graduates seeking to enter electricity distribution.
Standards & tools

What you'll work with

  • EN 50160 (voltage characteristics of public networks)
  • Directive (EU) 2019/944 (internal electricity market)
  • Regulation (EU) 2023/1804 (AFIR, alternative fuels infrastructure)
  • IEC 61000-3-12 (harmonic current limits for equipment)
  • Royal Decree 1183/2020 (grid access and connection in Spain)
  • IEC 61968 (CIM for distribution management)
  • ISO 15118-20 (vehicle-to-grid communication interface)
  • Regulation (EU) 2016/1388 (demand connection network code)
  • OpenDSS
  • DIgSILENT PowerFactory
  • pandapower
  • QGIS
  • Python with Pyomo
Syllabus

12 modules · 1900 h

  1. 1.1Structure of the Spanish power system
  2. 1.2TSO and DSO roles
  3. 1.3Electric vehicle penetration forecasts
  4. 1.4Energy demand from charging
  5. 1.5Charging profiles by segment
  6. 1.6Energy transition and electrification
  7. 1.7Binding transmission planning
  8. 1.8Distribution company investment plans
  9. 1.9Mobility data for planning
  10. 1.10Case study: charging demand for a city
  1. 2.1Medium- and low-voltage network topologies
  2. 2.2Modelling lines and transformers
  3. 2.3Load flow in radial networks
  4. 2.4Unbalanced three-phase networks
  5. 2.5ZIP load models and profiles
  6. 2.6Smart meter data
  7. 2.7GIS tools for networks
  8. 2.8Model validation with measurements
  9. 2.9Time-series simulation
  10. 2.10Lab: load flow in OpenDSS
  1. 3.1Agent-based models
  2. 3.2Simulation of mobility and travel patterns
  3. 3.3Arrival probability and duration
  4. 3.4Monte Carlo methods
  5. 3.5Machine learning for forecasting
  6. 3.6Electric vehicle adoption scenarios
  7. 3.7Fleet charging versus private charging
  8. 3.8Seasonality and weather
  9. 3.9Forecast uncertainty
  10. 3.10Practical: Monte Carlo model of residential charging
  1. 4.1Transformer overloading
  2. 4.2Thermal limits of cables
  3. 4.3Voltage deviations
  4. 4.4Phase imbalance
  5. 4.5Charger harmonics
  6. 4.6Additional technical losses
  7. 4.7Transformer ageing
  8. 4.8Hosting capacity per node
  9. 4.9DSO acceptance criteria
  10. 4.10Workshop: impact study on an urban network
  1. 5.1Impact of high-power hubs
  2. 5.2High-voltage connection of charging stations
  3. 5.3N-1 contingency analysis
  4. 5.4Stability and reserve
  5. 5.5TSO-DSO coordination
  6. 5.6Planning of electricity infrastructure
  7. 5.7Access and connection to the transmission network
  8. 5.8Charging corridors for heavy-duty vehicles
  9. 5.9Long-term scenarios
  10. 5.10Case study: connection of a truck charging hub
  1. 6.1Electric vehicle flexibility
  2. 6.2Time-shifting of charging
  3. 6.3Price signals and time-of-use tariffs
  4. 6.4Direct load control
  5. 6.5Implicit and explicit demand response
  6. 6.6Aggregation of distributed resources
  7. 6.7Quantifying available flexibility
  8. 6.8User behaviour and acceptance
  9. 6.9Battery and mobility constraints
  10. 6.10Lab: price-based charging optimisation
  1. 7.1Local flexibility markets
  2. 7.2Platforms such as Piclo and NODES
  3. 7.3Flexibility products for the DSO
  4. 7.4Congestion mechanisms
  5. 7.5Verification and baselines
  6. 7.6Remuneration of flexibility services
  7. 7.7Coordination with wholesale markets
  8. 7.8Electricity Market Directive 2019/944
  9. 7.9European local flexibility experiences
  10. 7.10Practical: design of a flexibility product
  1. 8.1Traditional versus flexible planning
  2. 8.2Cost of network reinforcements
  3. 8.3Stochastic investment optimisation
  4. 8.4Value of flexibility as an alternative
  5. 8.5Cost-benefit analysis of networks
  6. 8.6Optimal location of charging points
  7. 8.7Joint planning of charging and network
  8. 8.8Regulated remuneration of distribution
  9. 8.9Investment risk analysis
  10. 8.10Workshop: optimisation with Pyomo
  1. 9.1Continuity of supply and TIEPI indices
  2. 9.2Voltage quality to EN 50160
  3. 9.3Harmonic emissions from chargers
  4. 9.4Flicker and fluctuations
  5. 9.5Protection with bidirectional flows
  6. 9.6Voltage dips and disconnection
  7. 9.7Grid codes for chargers
  8. 9.8IEC 61000 compatibility standards
  9. 9.9Power quality monitoring
  10. 9.10Case study: harmonic analysis in a car park
  1. 10.1Smart meters and data concentrators
  2. 10.2Low-voltage monitoring
  3. 10.3Sensors in transformer substations
  4. 10.4Integration of CPO and DSO data
  5. 10.5Digital twin of the distribution network
  6. 10.6Low-voltage state estimation
  7. 10.7Advanced demand analytics
  8. 10.8Data governance and protection
  9. 10.9Interoperability with CIM IEC 61968
  10. 10.10Practical: state estimation with AMI data
  1. 11.1Access and connection regulation
  2. 11.2CNMC circulars
  3. 11.3Network tariffs and charges
  4. 11.4Review of DSO investment plans
  5. 11.5Role of the DSO in charging
  6. 11.6AFIR Regulation and grid obligations
  7. 11.7Municipal electrification strategies
  8. 11.8Public consultation and participation
  9. 11.9European regulatory comparison
  10. 11.10Workshop: analysis of an access circular
  1. 12.1Definition of scope and scenarios
  2. 12.2Modelling the study network
  3. 12.3Charging demand forecast
  4. 12.4Grid impact study
  5. 12.5Assessment of available flexibility
  6. 12.6Comparison of reinforcement alternatives
  7. 12.7Cost-benefit analysis of the alternatives
  8. 12.8Planning recommendations
  9. 12.9Master's Thesis report
  10. 12.10Master's Thesis: defence before a panel
Methodology, software & labs

How you'll learn

100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. No fixed timetables: you progress at your own pace within the intake, so it can be combined with work.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is OpenDSS, DIgSILENT PowerFactory, pandapower, QGIS and Python with Pyomo, in free, academic or evaluation versions. Testing is studied through real procedures for hosting capacity studies, Monte Carlo simulation of charging demand and power quality analysis in networks with charging. Assessment is continuous by module, plus the final Master's Thesis.

Standards covered: EN 50160, Directive (EU) 2019/944 (internal electricity market), Regulation (EU) 2023/1804 (AFIR), IEC 61000-3-12, Royal Decree 1183/2020 (access and connection), IEC 61968, ISO 15118-20, Regulation (EU) 2016/1388 (demand connection network code).

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of EN 50160, Directive (EU) 2019/944 and Regulation (EU) 2023/1804 (AFIR) applied to real cases, not as a theoretical annex.
Industry software:OpenDSS, DIgSILENT PowerFactory, pandapower, QGIS and Python with Pyomo, in free, academic or evaluation versions.
Master's Thesis with defence:A complete grid planning study for e-mobility, defended before a panel.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Scope and network model
Define the scope and scenarios and model the study network.
Demand forecast
Forecast charging demand using Monte Carlo methods.
Grid impact study
Assess transformer, cable and voltage impacts and hosting capacity.
Flexibility versus reinforcement
Compare flexibility and reinforcement alternatives through cost-benefit analysis.
Master's Thesis
A complete grid planning study, defended before a panel.
Career opportunities

Where this takes you

Network planning engineerEnergy flexibility analystGrid study engineerE-mobility consultantEnergy data analystElectricity regulation specialist
Admissions & scholarships

Requirements

  • A university degree in engineering, science or architecture, or equivalent demonstrable professional experience.
  • An internet connection and a computer able to run the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with OpenDSS, DIgSILENT PowerFactory, pandapower, QGIS and Python with Pyomo, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.

A university degree in engineering, science or architecture, or equivalent professional experience, plus a computer able to run the programme software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Master’s in Grid Planning for e-Mobility Engineering — Impact Studies, DSO/TSO, Flexible DemandEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.