Postgraduate DiplomaEnergy and Networks Applications open

Postgraduate Diploma in Cold-Ironing and Ship-to-Grid Compatibility

Online 800-hour Postgraduate Diploma in Cold-Ironing and Ship-to-Grid Compatibility. 8 modules covering IEC/IEEE 80005-1 (high-voltage port connection), IEC/IEEE 80005-3 (low-voltage port connection) and ETAP. Assigned tutor and open enrolment.

Duration800 h
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma

Postgraduate Diploma in Cold-Ironing and Ship-to-Grid Compatibility — studying from India

India's power sector is one of the largest in the world, combining generation, transmission and distribution with rapid growth in renewable energy. Public utilities such as NTPC and Power Grid Corporation of India operate major assets, while private firms and state distribution companies manage local networks. The Central Electricity Authority, the Central Electricity Regulatory Commission and the Ministry of Power guide planning and regulation, and the Bureau of Energy Efficiency promotes efficiency standards. Engineers work on grid operations, substations, renewable integration and energy management systems across the country.

Fees for India: ₹95,000 (Indian Rupee), with instalments and employer sponsorship available.

Relevant bodies in India

  • Central Electricity Authority (CEA)
  • Central Electricity Regulatory Commission (CERC)
  • Power Grid Corporation of India Limited
  • Bureau of Energy Efficiency (BEE)

Typical roles

  • Power Systems Engineer
  • Grid Operations Engineer
  • Transmission Planning Engineer
  • Renewable Integration Engineer

Questions from India

Which professional bodies in India recognise energy and power network engineers?

Power engineers in India are commonly recognised through the Institution of Engineers (India), the Central Electricity Authority for technical standards, and state electricity regulatory commissions for utility work. Registration as a licensed electrical contractor or supervisor follows state rules. SEIUM's qualifications are private, not state degrees and not accredited by any national body, so recognition is decided by employers or the relevant body.

Which employers in India hire energy and networks engineers?

Employers include state and central power utilities, transmission companies such as Power Grid Corporation, renewable energy developers, and grid and automation firms. Smart grid and distribution projects also hire engineers. A private online qualification can help with specialisation, but employers mostly assess field experience, utility knowledge and project delivery.

Is this programme manageable with a job in India, and does it need a visa?

The programme is 100% online and taught in English, so you can study from India with no student visa. Plan around IST when scheduling. Specialist courses are about 300 hours, diplomas about 800 and master's about 1,900. You get an assigned technical tutor, and fees can be paid in instalments. Many energy employers fund professional training, so ask your manager about sponsorship.

Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Explain the environmental benefits of port electrification.

02

Apply the requirements of the IEC/IEEE 80005 standards.

03

Design the shore-side installation with frequency conversion.

04

Define the electrical adaptations required onboard.

05

Assess electrical compatibility with the distribution network.

06

Establish operating and safety procedures for the connection.

07

Analyse business models and sources of finance.

Profile

Who it's for

  • Port electrification engineer looking to specialise in Cold-Ironing and Ship-to-Grid Compatibility.
  • Marine electrical engineer looking to specialise in Cold-Ironing and Ship-to-Grid Compatibility.
  • Port infrastructure project manager looking to specialise in Cold-Ironing and Ship-to-Grid Compatibility.
  • Grid connection engineer looking to specialise in Cold-Ironing and Ship-to-Grid Compatibility.
  • Maritime decarbonisation consultant looking to specialise in Cold-Ironing and Ship-to-Grid Compatibility.
  • Frequency converter specialist looking to specialise in Cold-Ironing and Ship-to-Grid Compatibility.
  • Graduates in engineering or science seeking to join port authorities.
Standards & tools

What you'll work with

  • IEC/IEEE 80005-1 (high-voltage shore connection)
  • IEC/IEEE 80005-3 (low-voltage shore connection)
  • IEC 62613-1 (plugs and sockets for ship-to-shore connection)
  • Regulation (EU) 2023/1804 (AFIR)
  • Regulation (EU) 2023/1805 (FuelEU Maritime)
  • IEC 61000-3-6 (harmonic emission limits)
Syllabus

8 modules · 800 h

  1. 1.1Emissions from moored ships and air quality
  2. 1.2FuelEU Maritime Regulation and the OPS obligation
  3. 1.3AFIR Regulation and ports on the TEN-T network
  4. 1.4Ship typologies: cruise ships, ferries and container ships
  5. 1.5Electrical demand of ships in port
  6. 1.6Onboard electrical systems at 50 and 60 Hz
  7. 1.7Technical and economic barriers to cold-ironing
  8. 1.8Experiences in European and Californian ports
  9. 1.9Stakeholders: port authority, shipping company and distributor
  10. 1.10Case study: demand inventory for a ferry port
  1. 2.1IEC/IEEE 80005-1 standard for high voltage
  2. 2.2IEC/IEEE 80005-3 for low voltage
  3. 2.3IEC 62613 connectors and sockets
  4. 2.4Specific requirements by ship type
  5. 2.5Classification society rules
  6. 2.6Equipotential bonding and safety circuits
  7. 2.7Interlocks and emergency stop
  8. 2.8Ship-to-shore communications
  9. 2.9Certification and compatibility testing
  10. 2.10Practice: compatibility checklist for a cruise ship
  1. 3.1Port substation and high-voltage supply
  2. 3.2Static frequency converters
  3. 3.3Isolation transformers
  4. 3.4Earthing systems and earthing resistance
  5. 3.5Cable management and motorised cable reels
  6. 3.6Connection arms and cranes
  7. 3.7Distribution to multiple berths
  8. 3.8Protection and selectivity
  9. 3.9Quay civil works and cable ducts
  10. 3.10Workshop: single-line diagram of a 16 MW OPS installation
  1. 4.1Main switchboard and shore connection panel
  2. 4.2Seamless load transfer
  3. 4.3Synchronisation with auxiliary generating sets
  4. 4.4Retrofitting existing ships
  5. 4.5Space and weight in the marine installation
  6. 4.6Onboard protection and coordination with shore
  7. 4.7Crew training
  8. 4.8Requirements of shipping companies and owners
  9. 4.9Adaptation costs by ship type
  10. 4.10Case study: retrofit of a container ship
  1. 5.1Ship-to-shore short-circuit studies
  2. 5.2Inrush currents of marine transformers
  3. 5.3Harmonics from frequency converters
  4. 5.4Fluctuations and flicker in the distribution network
  5. 5.5Integration with the port's weak grid
  6. 5.6Storage and demand management
  7. 5.7Renewables in port and port microgrids
  8. 5.8Stability studies during transfer
  9. 5.9Modelling in EMT simulation
  10. 5.10Laboratory: load transfer simulation
  1. 6.1Connection and disconnection procedures
  2. 6.2HAZOP analysis of operations
  3. 6.3High-voltage electrical risk on the quay
  4. 6.4Live working and lock-out/tag-out
  5. 6.5Maintenance of connectors and cables
  6. 6.6Monitoring and telemetry
  7. 6.7Incident management and connection faults
  8. 6.8Coordination with port operations
  9. 6.9Usage and availability indicators
  10. 6.10Practice: operating procedure for a ferry connection
  1. 7.1CAPEX of OPS installations
  2. 7.2Electricity tariffs and energy taxation
  3. 7.3Electricity tax exemption
  4. 7.4Concession and operating models
  5. 7.5CEF grants and transport funds
  6. 7.6Social cost-benefit analysis
  7. 7.7Comparison with alternative fuels
  8. 7.8Contracts with shipping companies
  9. 7.9Emissions reduction and its valuation
  10. 7.10Case study: cost-benefit analysis of a cruise terminal
  1. 8.1Port selection and berths
  2. 8.2Demand estimation and load profiles
  3. 8.3Shore-side installation design
  4. 8.4Fleet compatibility requirements
  5. 8.5Grid impact study
  6. 8.6Operation and safety plan
  7. 8.7Economic analysis and financing
  8. 8.8Implementation plan
  9. 8.9Report and presentation
  10. 8.10Final review with the tutor
Methodology, software & labs

How you'll learn

100 % online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: students progress at their own pace within the intake, allowing them to combine the course with work.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is ETAP, DIgSILENT PowerFactory, MATLAB/Simulink, AutoCAD Electrical, in free, academic or evaluation versions. Tests are studied using real procedures for port load-flow studies, ship-to-shore connection and synchronisation tests, and economic feasibility analysis. Assessment is continuous by module, plus the final integrative project.

Accredited laboratories(EN ISO/IEC 17025) with rotor test bench, EMC/Lightning pre-compliance, HIL/SIL, vibration/acoustics.
Evidence-driven final project:safety case, test plan, compliance dossier and operating limits.
Industry mentoring:lecturers with experience in training, , eVTOL/UAM and flight test.
Flexible format(hybrid/online), international cohorts and support from SEIUM Career Services.
Ethics and safety:a safety-by-design approach, OT cyber-security, DIH and compliance as its pillars.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Selection of the port and berths

Explain the environmental benefits of port electrification.

Demand estimation and load profiles

Apply the requirements of the IEC/IEEE 80005 standards.

Shore-side installation design

Design the shore-side installation with frequency conversion.

Fleet compatibility requirements

Define the electrical adaptations required onboard.

Grid impact study

Assess electrical compatibility with the distribution network.

Career opportunities

Where this takes you

Port electrification engineerMarine electrical engineerPort infrastructure project managerGrid connection engineerMaritime decarbonisation consultantFrequency converter specialist
Admissions & scholarships

Requirements

  • Prior technical training or professional experience in the sector. No university degree is required.
  • Internet connection and a computer capable of running the programme's software.
  • Sufficient command of Spanish to follow technical standards documentation.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme comprises 800 hours in total, spread over 6 to 8 months. That is between 10 and 15 hours a week on average, compatible with a full-time job.

The course uses ETAP, DIgSILENT PowerFactory, MATLAB/Simulink and AutoCAD Electrical. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.

An own diploma from SEIUM upon passing the continuous assessment and the final integrative project. It is in-house training, not an official qualification from the Ministry.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher-level programme. Consult the recognition policy when enrolling.

Postgraduate Diploma in Cold-Ironing and Ship-to-Grid CompatibilityEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.