Master'sEnergy and Networks Applications open

Master’s in Utility-Scale BESS: Engineering and Safety

Online master's programme of 1,900 hours in utility-scale BESS engineering and safety. 12 modules covering large-scale battery storage, cell electrochemistry, system engineering, battery and energy management systems, safety hazards, fire protection, electrical design and protection, standards and certification, construction and commissioning, and operation, maintenance and end of life, with IEC 62933-5-2, UL 9540A and NFPA 855 and an assigned technical tutor.

Duration12–14 months
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma

Master’s in Utility-Scale BESS: Engineering and Safety — studying from India

India's power sector is one of the largest in the world, combining generation, transmission and distribution with rapid growth in renewable energy. Public utilities such as NTPC and Power Grid Corporation of India operate major assets, while private firms and state distribution companies manage local networks. The Central Electricity Authority, the Central Electricity Regulatory Commission and the Ministry of Power guide planning and regulation, and the Bureau of Energy Efficiency promotes efficiency standards. Engineers work on grid operations, substations, renewable integration and energy management systems across the country.

Fees for India: ₹840,000 (Indian Rupee), with instalments and employer sponsorship available.

Relevant bodies in India

  • Central Electricity Authority (CEA)
  • Central Electricity Regulatory Commission (CERC)
  • Power Grid Corporation of India Limited
  • Bureau of Energy Efficiency (BEE)

Typical roles

  • Power Systems Engineer
  • Grid Operations Engineer
  • Transmission Planning Engineer
  • Renewable Integration Engineer

Questions from India

Which professional bodies in India recognise energy and power network engineers?

Power engineers in India are commonly recognised through the Institution of Engineers (India), the Central Electricity Authority for technical standards, and state electricity regulatory commissions for utility work. Registration as a licensed electrical contractor or supervisor follows state rules. SEIUM's qualifications are private, not state degrees and not accredited by any national body, so recognition is decided by employers or the relevant body.

Which employers in India hire energy and networks engineers?

Employers include state and central power utilities, transmission companies such as Power Grid Corporation, renewable energy developers, and grid and automation firms. Smart grid and distribution projects also hire engineers. A private online qualification can help with specialisation, but employers mostly assess field experience, utility knowledge and project delivery.

Is this programme manageable with a job in India, and does it need a visa?

The programme is 100% online and taught in English, so you can study from India with no student visa. Plan around IST when scheduling. Specialist courses are about 300 hours, diplomas about 800 and master's about 1,900. You get an assigned technical tutor, and fees can be paid in instalments. Many energy employers fund professional training, so ask your manager about sponsorship.

Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Understand battery electrochemistry and degradation.

02

Design large-scale BESS systems.

03

Specify battery management and energy management systems.

04

Analyse thermal runaway and propagation risks.

05

Design fire and explosion protection.

06

Apply battery safety standards.

07

Plan construction, operation and end of life.

Profile

Who it's for

  • Energy storage system engineers.
  • Fire safety engineers moving into battery storage.
  • Commissioning engineers.
  • Electrical design engineers.
  • Battery O&M managers.
  • BESS project managers.
  • Engineering or science graduates seeking to enter the energy storage sector.
Standards & tools

What you'll work with

  • IEC 62933-5-2 (safety requirements for grid-integrated electrochemical storage systems)
  • UL 9540A (test method for thermal runaway fire propagation in battery systems)
  • NFPA 855 (installation of stationary energy storage systems)
  • IEC 62619 (safety requirements for industrial lithium cells and batteries)
  • UL 9540 (energy storage systems and equipment)
  • Regulation (EU) 2023/1542 (EU Batteries Regulation)
  • IEC 62485-5 (safe operation of stationary lithium-ion batteries)
  • NFPA 68 (explosion protection by deflagration venting)
  • HOMER Pro
  • PVsyst
  • DIgSILENT PowerFactory
  • ETAP
  • FDS (Fire Dynamics Simulator)
Syllabus

12 modules

  1. 1.1The role of storage in the power system
  2. 1.2Arbitrage and capacity applications
  3. 1.3Balancing services
  4. 1.4The BESS market in Europe
  5. 1.5Reference projects
  6. 1.6Project life cycle
  7. 1.7Project stakeholders
  8. 1.8Project risks
  9. 1.9Key technical indicators
  10. 1.10Case study: analysis of a 200 MWh project
  1. 2.1Lithium-ion chemistry
  2. 2.2LFP and NMC cells
  3. 2.3Prismatic, cylindrical and pouch formats
  4. 2.4Charge and discharge curves
  5. 2.5State of charge and state of health
  6. 2.6Degradation mechanisms
  7. 2.7Sodium-ion chemistry
  8. 2.8Flow batteries
  9. 2.9Technology selection
  10. 2.10Lab: characterisation of an LFP cell
  1. 3.1Modules and racks
  2. 3.2Containers and enclosures
  3. 3.3Power conversion system
  4. 3.4Transformers and medium voltage
  5. 3.5Plant auxiliary systems
  6. 3.6Thermal management of containers
  7. 3.7DC cabling
  8. 3.8Plant design
  9. 3.9Drawings and layout
  10. 3.10Practical exercise: layout of a 50 MW BESS
  1. 4.1BMS architecture
  2. 4.2Voltage and temperature measurement
  3. 4.3Cell balancing
  4. 4.4State estimation
  5. 4.5BMS protections
  6. 4.6BMS communications with the PCS
  7. 4.7Alarm management
  8. 4.8Integration with the EMS
  9. 4.9Functional safety of the BMS
  10. 4.10Lab: SOC estimation algorithm
  1. 5.1EMS functions
  2. 5.2Plant control
  3. 5.3Operating strategies
  4. 5.4Price forecasting
  5. 5.5Dispatch optimisation
  6. 5.6Degradation management
  7. 5.7Communication with the system operator
  8. 5.8Plant SCADA
  9. 5.9EMS cybersecurity
  10. 5.10Practical exercise: dispatch optimisation with Python
  1. 6.1Thermal runaway mechanism
  2. 6.2Cell-to-cell propagation
  3. 6.3Gas release
  4. 6.4Explosion risk
  5. 6.5Incidents in real projects
  6. 6.6Hazard analysis
  7. 6.7Risk assessment
  8. 6.8Supply chain safety
  9. 6.9Lessons learned from incidents
  10. 6.10Workshop: hazard analysis of a container
  1. 7.1UL 9540A testing
  2. 7.2Early gas detection
  3. 7.3Suppression systems
  4. 7.4Ventilation and explosion venting
  5. 7.5Separation distances
  6. 7.6Firefighting strategies
  7. 7.7NFPA 855 requirements
  8. 7.8Coordination with emergency services
  9. 7.9Emergency response plan
  10. 7.10Practical exercise: deflagration venting design
  1. 8.1Plant single-line diagram
  2. 8.2DC protection
  3. 8.3Protection coordination
  4. 8.4Earthing
  5. 8.5DC insulation monitoring
  6. 8.6Arc flash risk
  7. 8.7DC circuit breakers
  8. 8.8Medium-voltage connection
  9. 8.9Plant electrical studies
  10. 8.10Lab: arc flash study
  1. 9.1IEC 62619 and IEC 62933
  2. 9.2UL 9540 system standard
  3. 9.3EU Batteries Regulation
  4. 9.4Transport of batteries
  5. 9.5CE marking of equipment
  6. 9.6Grid connection requirements
  7. 9.7Environmental permitting of the project
  8. 9.8Equipment certification
  9. 9.9Compliance audits
  10. 9.10Case study: certification file
  1. 10.1Construction plan
  2. 10.2Container logistics
  3. 10.3Site safety
  4. 10.4Factory acceptance tests
  5. 10.5Commissioning
  6. 10.6Capacity tests
  7. 10.7Efficiency tests
  8. 10.8Grid compliance tests
  9. 10.9Plant acceptance
  10. 10.10Practical exercise: commissioning protocol
  1. 11.1Plant monitoring
  2. 11.2Preventive maintenance plan
  3. 11.3Degradation management
  4. 11.4Capacity augmentation
  5. 11.5Performance guarantees
  6. 11.6Availability and contractual warranties
  7. 11.7Second life of batteries
  8. 11.8Battery recycling
  9. 11.9Decommissioning of the installation
  10. 11.10Workshop: O&M plan for a BESS
  1. 12.1Project definition
  2. 12.2Technology selection
  3. 12.3System design
  4. 12.4Safety analysis
  5. 12.5Fire protection design
  6. 12.6Operation plan
  7. 12.7Economic analysis of the project
  8. 12.8Conclusions and future work
  9. 12.9Master's Thesis report
  10. 12.10Master's Thesis: defence before a panel
Methodology, software & labs

How you'll learn

Training is 100% online on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within each intake, so you can combine the programme with your job.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is HOMER Pro, PVsyst, DIgSILENT PowerFactory, ETAP and FDS (Fire Dynamics Simulator), in free, academic or evaluation versions. Practical work is based on real procedures for propagation testing to UL 9540A, on-site capacity and efficiency tests and arc flash analysis. Assessment is continuous for each module, plus the final Master's Thesis.

Standards covered: IEC 62933-5-2, UL 9540A, NFPA 855, IEC 62619, UL 9540, Regulation (EU) 2023/1542 on batteries, IEC 62485-5 and NFPA 68.

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of IEC 62933-5-2, UL 9540A and NFPA 855 applied to real cases, not as a theoretical annex.
Industry software:HOMER Pro, PVsyst, DIgSILENT PowerFactory, ETAP and FDS (Fire Dynamics Simulator), in free, academic or evaluation versions.
Master's Thesis with defence:The complete engineering of a utility-scale BESS project, from technology selection and system design to safety analysis, fire protection, operation plan and economic analysis, defended before a panel.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Project definition and technology
Define the BESS application and select the cell chemistry and system architecture.
System and electrical design
Design the plant layout, PCS, protection and grid connection.
Safety analysis
Analyse thermal runaway and propagation hazards for the containers.
Fire protection and operation
Design detection, suppression and venting and plan O&M.
Master's Thesis
Present the full project with its economic analysis, defended before a panel.
Career opportunities

Where this takes you

Energy storage systems engineerFire safety engineerCommissioning engineerElectrical design engineerBattery O&M managerBESS project manager
Admissions & scholarships

Requirements

  • University degree in engineering, science or architecture, or equivalent demonstrable professional experience.
  • Internet connection and a computer capable of running the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 1,900 hours over 12–14 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with HOMER Pro, PVsyst, DIgSILENT PowerFactory, ETAP and FDS (Fire Dynamics Simulator), using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the Master's Thesis. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed in a course or postgraduate diploma in the same area are recognised in the higher programme. Ask about the recognition policy when you enrol.

A university degree in engineering, science or architecture (or equivalent professional experience), a computer able to run the programme software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Master’s in Utility-Scale BESS: Engineering and SafetyEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.