CourseOff-Road, Special Vehicles & Machinery Applications open

Diploma in Insurance Cover for Renewable Plants and Grids

Online postgraduate diploma of 800 hours in insurance cover for renewable plants and grids. 8 modules covering renewable asset risks, construction and operational cover, risk engineering, catastrophe modelling, underwriting and claims management, with ISO 31000, Solvency II and Moody's RMS Risk Modeler, with an assigned technical tutor.

Duration6–8 months
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma
Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Identify the specific risks of renewable plants and electricity grids.

02

Design insurance cover for the construction and operational phases.

03

Carry out risk engineering inspections.

04

Model losses from natural catastrophes.

05

Underwrite and price renewable energy risks.

06

Manage complex claims and recoveries.

07

Prepare a complete insurance programme for a renewable asset.

Profile

Who it's for

  • Energy risk underwriters at insurers and reinsurers.
  • Risk engineers who inspect wind, solar and grid assets.
  • Energy insurance brokers who design and place insurance programmes.
  • Industrial loss adjusters handling claims at renewable plants.
  • Risk managers at renewable energy developers.
  • Catastrophe modelling analysts working on energy portfolios.
  • Engineering or science graduates looking to move into insurance.
Standards & tools

What you'll work with

  • Spanish Insurance Contract Act 50/1980 (general insurance contract law)
  • ISO 31000 (risk management guidelines)
  • Directive 2009/138/EC Solvency II (insurer capital and solvency requirements)
  • IEC 61400-1 (wind turbine design requirements)
  • IEC 61215 (photovoltaic module design qualification)
  • IEC 62446-1 (testing and commissioning of PV systems)
  • Spanish Environmental Liability Act 26/2007 (environmental liability regime)
  • Moody's RMS Risk Modeler
  • Verisk Touchstone
  • PVsyst
  • WAsP
Syllabus

8 modules

  1. 1.1Onshore and offshore wind farms
  2. 1.2Photovoltaic plants and trackers
  3. 1.3Substations and transformers
  4. 1.4Battery storage
  5. 1.5Small hydropower
  6. 1.6Evacuation lines and distribution grids
  7. 1.7Natural hazards: hail, wind, flood
  8. 1.8Fire risks in installations
  9. 1.9Serial defects in components
  10. 1.10Workshop: risk map of a solar farm
  1. 2.1Contractors' and erection all risks
  2. 2.2Delay in start-up (DSU)
  3. 2.3Marine transit of components
  4. 2.4Construction third-party liability
  5. 2.5Maintenance and testing periods
  6. 2.6LEG defects clauses
  7. 2.7Serial loss clauses
  8. 2.8Commissioning risks
  9. 2.9Lender requirements
  10. 2.10Case study: insurance programme for a wind farm
  1. 3.1Operational all risks property damage
  2. 3.2Machinery breakdown
  3. 3.3Business interruption
  4. 3.4Natural and catastrophe perils
  5. 3.5Spanish Insurance Compensation Consortium (Consorcio de Compensación de Seguros)
  6. 3.6Third-party and environmental liability
  7. 3.7Cyber risk in plants and grids
  8. 3.8Performance guarantees and parametric products
  9. 3.9Cover for grids and lines
  10. 3.10Practical exercise: analysis of a hail loss
  1. 4.1On-site risk inspections
  2. 4.2IEC 61400 and IEC 61215 standards
  3. 4.3Commissioning according to IEC 62446-1
  4. 4.4Thermography and drone inspection
  5. 4.5Fire protection in substations
  6. 4.6Component failure analysis
  7. 4.7Maintenance and its influence on the premium
  8. 4.8Improvement recommendations
  9. 4.9Risk engineering report
  10. 4.10Case study: report on a wind farm
  1. 5.1Hail and convective storm models
  2. 5.2Extreme wind models
  3. 5.3Flood risk
  4. 5.4Probable maximum loss
  5. 5.5Exceedance curves
  6. 5.6Commercial catastrophe models
  7. 5.7Climate change and scenarios
  8. 5.8Risk accumulation in the portfolio
  9. 5.9Catastrophe reinsurance
  10. 5.10Lab: estimating probable maximum loss
  1. 6.1Underwriting information and questionnaires
  2. 6.2Rates, deductibles and sub-limits
  3. 6.3Market capacity and co-insurance
  4. 6.4Insurance programmes for electricity grids
  5. 6.5Captives and risk retention
  6. 6.6Facultative reinsurance
  7. 6.7Solvency II and risk capital
  8. 6.8Technical profitability of the portfolio
  9. 6.9Trends in the renewables market
  10. 6.10Practical exercise: quoting a photovoltaic plant
  1. 7.1Notification procedures
  2. 7.2Technical loss assessment
  3. 7.3Calculating business interruption loss
  4. 7.4Serial defects and recovery from manufacturers
  5. 7.5Disputes over the cause of loss
  6. 7.6Salvage and reuse of components
  7. 7.7Managing major losses
  8. 7.8Lessons learnt
  9. 7.9Loss ratio indicators
  10. 7.10Case study: fire at a substation
  1. 8.1Description of the asset and the project
  2. 8.2Risk identification and assessment
  3. 8.3Design of cover
  4. 8.4Limits, deductibles and sub-limits
  5. 8.5Maximum loss estimate
  6. 8.6Placement strategy
  7. 8.7Claims management plan
  8. 8.8Conclusions and recommendations
  9. 8.9Report and presentation
  10. 8.10Final project: final review with the tutor
Methodology, software & labs

How you'll learn

100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within the intake, so it can be combined with work.

Each module combines theory, guided reading of the original standards and applied exercises. The working software is Moody's RMS Risk Modeler, Verisk Touchstone, PVsyst and WAsP, in free, academic or evaluation versions. Exercises are based on real procedures: risk inspections at wind and solar farms, design of construction insurance programmes and loss assessment for natural hazard claims. Assessment is continuous by module, plus the final project.

Standards covered: Spanish Insurance Contract Act 50/1980, ISO 31000, Directive 2009/138/EC (Solvency II), IEC 61400-1, IEC 61215, IEC 62446-1, Spanish Environmental Liability Act 26/2007.

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of ISO 31000, Solvency II and the IEC 61400, IEC 61215 and IEC 62446-1 standards applied to real cases, not as a theoretical annex.
Industry software:Moody's RMS Risk Modeler, Verisk Touchstone, PVsyst and WAsP, in free, academic or evaluation versions.
Final project:A complete insurance programme for a renewable asset, from risk assessment to the placement strategy and claims plan, reviewed by your tutor.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Asset and risk assessment
Describe the asset and project and identify and assess its risks.
Cover design
Design the cover with its limits, deductibles and sub-limits.
Maximum loss estimate
Estimate the probable maximum loss using catastrophe modelling.
Placement and claims plan
Define the placement strategy and the claims management plan.
Final project
Present the complete insurance programme with conclusions and recommendations, reviewed by your tutor.
Career opportunities

Where this takes you

Energy risk underwriterRisk engineerEnergy insurance brokerIndustrial loss adjusterRisk manager at a renewable energy developerCatastrophe modelling analyst
Admissions & scholarships

Requirements

  • Prior technical training or professional experience in the sector. No university degree is required.
  • An internet connection and a computer capable of running the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 800 hours over 6–8 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with Moody's RMS Risk Modeler, Verisk Touchstone, PVsyst and WAsP, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the final project. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed are recognised in a higher programme in the same area (postgraduate diploma or master's). Ask about the recognition policy when you enrol.

Prior technical training or professional experience in the sector (no university degree required), a computer able to run the software, and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Diploma in Insurance Cover for Renewable Plants and GridsEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.