Mining Operations Planning Course
Online 300-hour course in mining operations planning. 6 modules covering JORC Code 2012 (reporting of resources and reserves), NI 43-101 (disclosure for mining projects) and Deswik. Assigned tutor and open enrolment.
Mining Operations Planning Course — studying from Canada
Canada's off-road and heavy machinery sector serves mining, forestry, agriculture and construction, all major contributors to the national economy. Manufacturers and dealers in Ontario, Alberta, Saskatchewan and British Columbia supply equipment for resource extraction and infrastructure. Mining activity in Northern Ontario, Quebec and the territories drives demand for rugged vehicle engineering and maintenance expertise. Engineers work on hydraulics, drivetrains, machine safety and special vehicle design.
Fees for Canada: C$698 (Canadian dollar), with instalments and employer sponsorship available.
Relevant bodies in Canada
Typical roles
Questions from Canada
Is this programme recognised by professional bodies in Canada for off-road and special vehicle engineering?
SEIUM's qualifications are private, not official state degrees, and are not accredited nationally in Canada. Professional engineering titles are regulated provincially, and vehicle and equipment safety is governed by standards such as those from the CSA and rules from Transport Canada where applicable. Recognition of a private qualification is decided by employers or the relevant body.
What employers in Canada might value this qualification for special vehicles and machinery?
Employers could include mining, forestry, agricultural, construction and specialist vehicle manufacturers across Canada. Each employer decides how much weight to place on a private qualification, and practical experience is often central in these sectors. The final project can demonstrate applied capability, but it does not guarantee any role.
How can I study this while working in Canada, and how is it funded?
The programme is online and in English, so you can study from anywhere in Canada without a student visa. Choose from 300-hour specialist courses, 800-hour postgraduate diplomas or 1,900-hour master's programmes. Fees are payable in instalments, and employer sponsorship is possible, which some Canadian employers offer for job-relevant training.
Take the controls.
Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.
What you will be able to do
Translate a resource model into a viable mining plan.
Design the geometry of an open-pit mine: benches, ramps and phases.
Size drilling and blasting while respecting vibration limits.
Calculate the loading and haulage fleet required for a production rate.
Estimate operating costs and prepare the production schedule.
Integrate mining safety and waste management into planning.
Present a complete mining plan with control indicators.
Who it's for
- Mining planning engineer who wants to specialise in Mining Operations Planning.
- Production manager at an open-pit mine who wants to specialise in Mining Operations Planning.
- Drilling and blasting engineer who wants to specialise in Mining Operations Planning.
- Mining cost analyst who wants to specialise in Mining Operations Planning.
- Short-term planner who wants to specialise in Mining Operations Planning.
- Mining fleet management manager who wants to specialise in Mining Operations Planning.
- Graduates in engineering or sciences seeking to enter metal mining.
What you'll work with
- JORC Code 2012 (reporting of resources and reserves)
- NI 43-101 (disclosure of mining projects)
- Royal Decree 863/1985 (General Regulation of Basic Mining Safety Standards)
- Royal Decree 130/2017 (Explosives Regulation)
- UNE 22381 (control of vibrations produced by blasting)
- Royal Decree 975/2009 (management of waste from extractive industries)
- Law 22/1973 (Mining Law)
6 modules · 300 h
1.1Geological model and block model1.2Grades, tonnages and cut-off grade1.3Resources and reserves: classification criteria1.4Selection of the mining method1.5Open-pit and underground: decision criteria1.6Planning horizons: long, medium and short term1.7Mining sequence and economic envelopes1.8Dilution, mining losses and recovery1.9Planning team and tools1.10Workshop: reading a block model and its plan
2.1Design of benches, batters and berms2.2Slope angles and geotechnical criteria2.3Ramp design and haulage gradients2.4Access, operating widths and turning radii2.5Design of tips and waste dumps2.6Capacity and life of waste facilities2.7Drainage and pumping of the mine2.8Phase sequencing and pushbacks2.9Closure design from the outset2.10Practice: designing a mining phase
3.1Drilling pattern design and parameters3.2Target fragmentation and its effect on the plant3.3Control of vibrations and flyrock3.4Explosives regulations and responsibilities3.5Coordination of blasting with operations3.6Mechanical excavation and roadheaders3.7Loading of material and equipment selection3.8Grade control at the face3.9Excavation efficiency indicators3.10Practice: planning an excavation campaign
4.1Selection and sizing of the loading fleet4.2Sizing of the haulage fleet4.3Cycles, times and availability factors4.4Operational simulation and bottlenecks4.5Fleet dispatch and dynamic allocation4.6Energy consumption per tonne moved4.7Fleet maintenance and availability4.8Transport alternatives: conveyors and pipelines4.9Automation and remote operation4.10Practice: sizing a haulage fleet
5.1Mine cost structure and cost per tonne5.2Operating and capital budgets5.3Short-term scheduling and compliance5.4Reconciliation between plan and execution5.5Grade control and plant feed blending5.6Operational indicators and dashboard5.7Deviation analysis and corrective actions5.8Management of mining contractors5.9Continuous improvement of operations5.10Practice: weekly schedule and its control
6.1Safety management in mining operations6.2Geotechnical risks and slope monitoring6.3Ventilation and atmosphere in underground workings6.4Water and mining waste management6.5Permits, conditions and environmental monitoring6.6Community relations and social licence6.7Closure plan and progressive rehabilitation6.8Financial guarantees for closure6.9Common errors in mine planning6.10Final project: complete mining plan for a deposit
How you'll learn
100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. No fixed timetables: students progress at their own pace within the intake, which allows them to combine it with work.
Each module combines theory, guided reading of the original standard and applied exercises. The working software is Deswik, Datamine Studio, Maptek Vulcan, Whittle (pit optimisation), advanced Excel, in free, academic or evaluation versions. Case studies are based on real pit design procedures and mining phase design, simulation of loading and haulage cycles, and cost-per-tonne analysis. Assessment is continuous for each module plus the final integrating project.
Build it end to end
Your final project follows the real engineering workflow, step by step, reviewed by your tutor.
Translate a resource model into a viable mining plan.
Design the geometry of an open-pit mine: benches, ramps and phases.
Size drilling and blasting while respecting vibration limits.
Calculate the loading and haulage fleet required for a production rate.
Estimate operating costs and prepare the production schedule.
Where this takes you
Requirements
- No prior degree is required.
- Internet connection and a computer capable of running the programme's software.
- Sufficient Spanish to follow the reading of technical standards.
Ready to start?
Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.
Frequently asked questions
The programme totals 300 hours spread over 3 to 5 months. That is an average of 10 to 15 hours per week, compatible with a full-time job.
You work with Deswik, Datamine Studio, Maptek Vulcan, Whittle (pit optimisation) and advanced Excel. Free, academic or evaluation versions are used, and the tutor indicates the free alternative where one exists.
A SEIUM own diploma upon passing the continuous assessment and the integrating project. It is in-house training, not an official Ministry qualification.
Yes. Modules passed in a course or postgraduate diploma in the same area are credited towards the advanced programme. Check the credit transfer policy when you enrol.
Related programmes
Course in Machinery Accident Prevention
Online 300-hour course in machinery accident prevention. 6 modules covering Law 31/1995 (Occupational Risk Prevention), Royal Decree 1215/1997 (work equipment) and Advanced Excel. Assigned tutor and…
Tractor Cab Vibration Course
Online 300 h course on vibration in tractor cabs. 6 modules covering ISO 2631-1 (whole-body vibration), Directive 2002/44/EC (exposure to vibration) and Simcenter Testlab. Dedicated tutor…
Safe Excavator Operation Course
300 h online course in safe excavator operation. 6 modules covering EN 474-5 (hydraulic excavators, safety), ISO 10567 (lifting capacity of hydraulic excavators) and Trimble Earthworks.…
More in Off-Road, Special Vehicles & Machinery
All Off-Road, Special Vehicles & Machinery programmes → · How to apply · Fees & financing · Scholarships