Postgraduate DiplomaNuclear Engineering & Nuclear Fuel Cycle Technologies Applications open

Diploma in Decommissioning Planning Strategies

Online postgraduate diploma of 800 hours in decommissioning planning strategies, structured in 8 modules covering decommissioning strategies, initial planning, radiological characterisation, activity sequencing, waste and materials planning, digital planning tools and project organisation, with an assigned technical tutor.

Duration6–8 months
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute diploma

Diploma in Decommissioning Planning Strategies — studying from Canada

Canada is a global leader in nuclear technology, most notably through CANDU reactor design and the development of medical isotopes. Ontario operates the largest nuclear fleet in the country, with major facilities at Pickering, Darlington and Bruce, while Atomic Energy of Canada Limited leads reactor research at Chalk River. The Canadian Nuclear Safety Commission regulates all nuclear activity. Engineers work on reactor design, fuel cycle technologies, decommissioning and radiation protection.

Fees for Canada: C$2,790 (Canadian dollar), with instalments and employer sponsorship available.

Relevant bodies in Canada

  • Canadian Nuclear Safety Commission (CNSC)
  • Canadian Nuclear Society (CNS)
  • Atomic Energy of Canada Limited (AECL)
  • Canadian Nuclear Association (CNA)

Typical roles

  • Nuclear Engineer
  • Reactor Physics Engineer
  • Radiation Protection Engineer
  • Fuel Cycle Engineer

Questions from Canada

Is this programme recognised by professional bodies in Canada for nuclear engineering?

SEIUM's qualifications are private, not official state degrees, and carry no national accreditation in Canada. Nuclear activities are regulated by the Canadian Nuclear Safety Commission, and professional engineering titles are provincially regulated. Nuclear roles often require specific licences or clearances, which a private qualification does not provide. Confirm with employers or the regulator.

Could this qualification help with nuclear career opportunities in Canada?

Canadian nuclear operators, utilities, fuel cycle firms and regulators' supplier networks employ engineers, but they set their own criteria. Many nuclear roles prioritise experience, security clearances and regulator-recognised training. The programme can add technical depth to your profile, but it does not guarantee entry or advancement in this tightly regulated field.

Can I study this online from Canada, and what is the workload?

Yes, the programme is 100% online and taught in English, and no student visa is required if you study from home. Specialist courses are 300 hours, postgraduate diplomas 800 hours and master's programmes 1,900 hours. Fees are payable in instalments, employer sponsorship is possible, and you receive an assigned technical tutor for guidance.

Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Compare decommissioning strategies.

02

Prepare decommissioning plans.

03

Plan radiological characterisation.

04

Sequence project activities.

05

Plan waste and materials management.

06

Use digital planning tools.

07

Organise the management of a decommissioning project.

Profile

Who it's for

  • Decommissioning planners
  • Nuclear project engineers
  • Radiological characterisation technicians
  • Waste managers
  • Radiation protection technicians
  • Decommissioning project managers
  • Engineering or science graduates looking to move into nuclear decommissioning
Standards & tools

What you'll work with

  • IAEA GSR Part 6 (general safety requirements for decommissioning of facilities)
  • IAEA SSG-47 (decommissioning of nuclear power plants, research reactors and other fuel cycle facilities)
  • IAEA SSG-49 (decommissioning of medical, industrial and research facilities)
  • Royal Decree 1836/1999 – RINR (Spanish regulation on nuclear and radioactive facilities)
  • Directive 2013/59/Euratom (EU basic safety standards for radiation protection)
  • WENRA Decommissioning Safety Reference Levels (European regulators’ safety reference levels)
  • CSN Instruction IS-11 (Spanish Nuclear Safety Council instruction)
  • Oracle Primavera P6
  • VRdose
  • MicroShield
  • Autodesk Navisworks
  • MCNP
Syllabus

8 modules

  1. 1.1Immediate dismantling strategy
  2. 1.2Deferred dismantling strategy
  3. 1.3Entombment (in situ confinement)
  4. 1.4Strategy selection criteria
  5. 1.5End state of the site
  6. 1.6Release from regulatory control
  7. 1.7International decommissioning experience
  8. 1.8Decommissioning in Spain
  9. 1.9Lessons from completed projects
  10. 1.10Case study: the strategy for the Garoña nuclear power plant
  1. 2.1Decommissioning plan from the design stage
  2. 2.2Initial radiological characterisation
  3. 2.3Inventory of materials and waste
  4. 2.4Study of alternatives
  5. 2.5Waste management plan
  6. 2.6Resource planning
  7. 2.7Project schedule
  8. 2.8Interface management
  9. 2.9Licensing documentation
  10. 2.10Practical exercise: structure of a decommissioning plan
  1. 3.1Characterisation objectives
  2. 3.2Sampling and in situ measurements
  3. 3.3Gamma spectrometry measurements
  4. 3.4Activation calculations
  5. 3.5Radionuclide vectors
  6. 3.6Producing radiological maps
  7. 3.7Characterisation databases
  8. 3.8Soil characterisation
  9. 3.9Final radiological characterisation
  10. 3.10Laboratory: calculating radionuclide vectors
  1. 4.1Transition phase after shutdown
  2. 4.2Fuel offloading
  3. 4.3System decontamination
  4. 4.4Component dismantling
  5. 4.5Reactor vessel segmentation
  6. 4.6Building demolition
  7. 4.7Site remediation
  8. 4.8Project critical path
  9. 4.9Sequence optimisation
  10. 4.10Practical exercise: dismantling sequence for a circuit
  1. 5.1Classification of materials
  2. 5.2Clearance strategy
  3. 5.3Waste minimisation
  4. 5.4Metal recycling
  5. 5.5Storage capacity
  6. 5.6Waste logistics
  7. 5.7Waste acceptance criteria
  8. 5.8Material traceability
  9. 5.9Waste balance
  10. 5.10Workshop: materials balance for a project
  1. 6.1Planning with Primavera P6
  2. 6.23D models and BIM
  3. 6.3Virtual reality for planning
  4. 6.4Dose simulation
  5. 6.5Information management
  6. 6.6Digital twins for decommissioning
  7. 6.7Project risk management
  8. 6.8Progress indicators
  9. 6.9Lessons-learned register
  10. 6.10Laboratory: dose simulation in a virtual environment
  1. 7.1The licensee’s organisation
  2. 7.2Transition of operating staff
  3. 7.3Knowledge management
  4. 7.4Selection of specialist contractors
  5. 7.5Safety culture
  6. 7.6Operational radiation protection
  7. 7.7Stakeholder communication
  8. 7.8Relationship with the regulator
  9. 7.9Change control
  10. 7.10Case study: transition from operation to decommissioning
  1. 8.1Selection of the facility
  2. 8.2Analysis of strategies
  3. 8.3Preliminary radiological characterisation
  4. 8.4Sequence of activities
  5. 8.5Waste plan
  6. 8.6Schedule and resources
  7. 8.7Planning conclusions
  8. 8.8Identified project risks
  9. 8.9Report and presentation
  10. 8.10Final project: final review with the tutor
Methodology, software & labs

How you'll learn

The programme is delivered 100% online on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. There are no fixed timetables: you progress at your own pace within each intake, so it fits alongside your job.

Each module combines theory, guided reading of the original standards and applied exercises. You work with Oracle Primavera P6, VRdose, MicroShield, Autodesk Navisworks and MCNP in free, academic or evaluation versions. Practical work is based on real procedures for radiological characterisation campaigns, dose simulations of work activities and analyses of strategy alternatives. Assessment is continuous by module, plus a final capstone project.

Standards covered: IAEA GSR Part 6, IAEA SSG-47, IAEA SSG-49, Royal Decree 1836/1999 (RINR), Council Directive 2013/59/Euratom, WENRA Decommissioning Safety Reference Levels, CSN Instruction IS-11.

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of IAEA GSR Part 6, IAEA SSG-47 and IAEA SSG-49 applied to real cases, not as a theoretical annex.
Industry software:Oracle Primavera P6, VRdose, MicroShield, Autodesk Navisworks and MCNP, in free, academic or evaluation versions.
Final project:A complete decommissioning plan for a facility, from strategy analysis to activity sequence, waste plan, schedule and risks, reviewed by your tutor.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Strategy selection
Select the facility and analyse the decommissioning strategy alternatives.
Radiological characterisation
Carry out a preliminary characterisation and calculate radionuclide vectors.
Activity sequencing
Define the dismantling sequence and the project critical path.
Waste and dose planning
Draw up the materials balance and simulate work doses in a virtual environment.
Final project
A complete decommissioning plan with schedule, resources and risks, reviewed by your tutor.
Career opportunities

Where this takes you

Decommissioning plannerNuclear project engineerRadiological characterisation technicianWaste managerRadiation protection technicianDecommissioning project manager
Admissions & scholarships

Requirements

  • Prior technical training or professional experience in the sector. No university degree is required.
  • An internet connection and a computer capable of running the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 800 hours over 6–8 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with Oracle Primavera P6, VRdose, MicroShield, Autodesk Navisworks and MCNP, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute diploma, awarded on passing the continuous assessment and the final project. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed are recognised in a higher programme in the same area (postgraduate diploma or master's). Ask about the recognition policy when you enrol.

Prior technical training or professional experience in the sector (no university degree required), a computer able to run the software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Diploma in Decommissioning Planning StrategiesEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.