CourseCivil, Rail & Smart Cities Applications open

Activated Sludge Plant Operation Course

Online course of 300 hours in the operation of activated sludge plants. 6 modules covering the activated sludge process, operational control, operating problems, nutrient removal, and energy efficiency and modelling, applying Directive (EU) 2024/3019 and Royal Decree 509/1996 with BioWin, with an assigned technical tutor.

Duration3 months
ModeOnline
LanguageEnglish
Start datesSet by the faculty
AwardSEIUM Institute certificate

Activated Sludge Plant Operation Course — studying from Canada

Canada's infrastructure needs drive significant civil engineering activity, from highways and bridges to urban transit and water systems. Major transit projects in Toronto, Montréal, Vancouver and Calgary involve rail, tunnelling and smart city technologies. Rail operators and suppliers, including Canadian Pacific Kansas City and Canadian National, depend on engineering expertise in track, signalling and structures. Provincial ministries of transportation and municipal engineering departments are key employers, alongside consulting firms.

Fees for Canada: 695 CA$ (Canadian dollar), with instalments and employer sponsorship available.

Relevant bodies in Canada

  • Engineers Canada
  • Canadian Society for Civil Engineering (CSCE)
  • Canadian Standards Association (CSA Group)
  • Railway Association of Canada

Typical roles

  • Civil Engineer
  • Rail Infrastructure Engineer
  • Transportation Planner
  • Structural Engineer

Questions from Canada

Can I study while working full time in Canada?

Yes. All programmes are 100% online, and you can plan your study around your working schedule, with a dedicated technical tutor supporting your progress.

Do I need to attend campus or sit exams in person?

No. Programmes are delivered entirely online, and the final project is completed remotely with tutor guidance.

Virtual lab · try it before you enrol

Take the controls.

Run a real engineering trade-off from this field. Move the sliders, watch the model react in real time and beat the challenge.

SIM · LIVE ●
Learning outcomes

What you will be able to do

01

Understand the microbiology and kinetics of the activated sludge process.

02

Control the key operating parameters of the plant.

03

Diagnose and correct problems such as bulking and foaming.

04

Optimise biological nitrogen and phosphorus removal.

05

Reduce aeration energy consumption.

06

Apply ASM models to simulate plant operation.

07

Prepare an operational improvement plan for a real plant.

Profile

Who it's for

  • Wastewater treatment plant operators.
  • WWTP process managers.
  • Wastewater laboratory technicians.
  • Process optimisation engineers.
  • WWTP operations consultants.
  • Discharge control technicians.
  • Engineering or science graduates seeking to join WWTP operating companies.
Standards & tools

What you'll work with

  • Directive (EU) 2024/3019 (urban wastewater treatment)
  • Royal Decree 509/1996 (implementing Royal Decree-Law 11/1995)
  • Royal Decree-Law 11/1995 (rules applicable to urban wastewater treatment)
  • Standard Methods for the Examination of Water and Wastewater (APHA laboratory methods)
  • UNE-EN 12255 (wastewater treatment plants)
  • Royal Decree 1310/1990 (use of sewage sludge in agriculture)
  • Royal Decree 664/1997 (protection against biological agents at work)
  • BioWin
  • Hydromantis GPS-X
  • DESASS
  • Plant SCADA
  • Microsoft Excel
Syllabus

6 modules

  1. 1.1Microbiology of activated sludge
  2. 1.2Flocculation and floc structure
  3. 1.3Configurations: plug flow and complete mix
  4. 1.4Sludge loading rate and sludge age
  5. 1.5F/M ratio and sludge production
  6. 1.6Oxygen requirements
  7. 1.7Secondary settling and recirculation
  8. 1.8Variants: extended aeration and SBR
  9. 1.9Expected treatment performance
  10. 1.10Case study: diagnosis of the parameters of a real plant
  1. 2.1Sludge volume index (SVI)
  2. 2.2Mixed liquor suspended solids
  3. 2.3Control of wasting and sludge age
  4. 2.4Dissolved oxygen control
  5. 2.5External and internal recirculation
  6. 2.6Redox potential measurement
  7. 2.7Online ammonium and nitrate analysers
  8. 2.8V30 and settleability tests
  9. 2.9Daily control sheets
  10. 2.10Practical exercise: calculating wasting to maintain sludge age
  1. 3.1Filamentous bulking and its causes
  2. 3.2Biological foams and Microthrix
  3. 3.3Dispersed growth and pin-point floc
  4. 3.4Denitrification in the clarifier
  5. 3.5Toxicity and industrial discharges
  6. 3.6Load and hydraulic shocks
  7. 3.7Sludge microscopy and bioindicators
  8. 3.8Corrective strategies
  9. 3.9Recording and learning from incidents
  10. 3.10Lab: microscopic identification of filamentous bacteria
  1. 4.1Nitrification and limiting factors
  2. 4.2Denitrification and carbon source
  3. 4.3Modified Ludzack-Ettinger scheme
  4. 4.4Biological phosphorus removal
  5. 4.5Chemical phosphorus precipitation
  6. 4.6A2O and UCT processes
  7. 4.7Advanced aeration control
  8. 4.8Dewatering return streams
  9. 4.9Compliance in sensitive areas
  10. 4.10Workshop: adjusting internal recycle to reduce nitrates
  1. 5.1Aeration energy consumption
  2. 5.2Fine-bubble diffusers and their fouling
  3. 5.3Blowers and pressure-based control
  4. 5.4ASM1 and ASM2d models
  5. 5.5Dynamic plant simulation
  6. 5.6Model calibration with operating data
  7. 5.7Set-point optimisation
  8. 5.8Benchmarking indicators
  9. 5.9Maintenance of critical equipment
  10. 5.10Case study: reducing aeration consumption
  1. 6.1Description of the plant and its problems
  2. 6.2Collection of operating data
  3. 6.3Performance analysis
  4. 6.4Diagnosis of process problems
  5. 6.5Proposed control strategies
  6. 6.6Scenario simulation
  7. 6.7Improvement and monitoring plan
  8. 6.8Estimation of savings
  9. 6.9Report and presentation
  10. 6.10Final project: final review with your tutor
Methodology, software & labs

How you'll learn

100% online training on the SEIUM campus, with downloadable material, recorded classes and an assigned technical tutor. No fixed timetables: you progress at your own pace within the intake, so it fits around your work.

Each module combines theory, guided reading of the original standard and applied exercises. The working software is BioWin, Hydromantis GPS-X, DESASS, plant SCADA and Microsoft Excel, in free, academic or evaluation versions. Tests are studied on real procedures for daily control of process parameters, microscopic identification of sludge and dynamic simulation of aeration strategies. Assessment is continuous per module, plus the final project.

Standards covered: Directive (EU) 2024/3019, Royal Decree 509/1996, Royal Decree-Law 11/1995, Standard Methods for the Examination of Water and Wastewater (APHA), UNE-EN 12255, Royal Decree 1310/1990, Royal Decree 664/1997.

Assigned technical tutor:every module ends with a deliverable that your tutor marks individually.
Standards-based learning:guided reading of Directive (EU) 2024/3019, Royal Decree 509/1996 and Royal Decree-Law 11/1995 applied to real cases, not as a theoretical annex.
Industry software:BioWin, Hydromantis GPS-X, DESASS, plant SCADA and Microsoft Excel, in free, academic or evaluation versions.
Final project:an operational improvement plan for a real activated sludge plant, from data analysis to scenario simulation and estimated savings, reviewed by your tutor.
Flexible format:100% online, no fixed timetables, compatible with full-time work.
Capstone project

Build it end to end

Your final project follows the real engineering workflow, step by step, reviewed by your tutor.

Describe the plant
Describe the plant and its problems and collect its operating data.
Analyse performance
Analyse treatment performance and diagnose the process problems.
Propose control strategies
Propose control strategies and simulate them in operating scenarios.
Plan improvements
Draw up the improvement and monitoring plan and estimate the savings.
Final project
Present the activated sludge operation improvement report, reviewed by your tutor.
Career opportunities

Where this takes you

Wastewater treatment plant operatorWWTP process managerWastewater laboratory technicianProcess optimisation engineerWWTP operations consultantDischarge control technician
Admissions & scholarships

Requirements

  • No prior qualification is required.
  • An internet connection and a computer capable of running the programme software.
  • English sufficient to read technical standards.

Ready to start?

Send your application today. Our admissions team replies within 72 hours with your study plan and funding options.

FAQ

Frequently asked questions

The programme totals 300 hours over 3 months. You set your own pace within each intake, and your tutor helps you plan the workload around your job.

You work with BioWin, Hydromantis GPS-X, DESASS, plant SCADA and Microsoft Excel, using free, academic or evaluation versions. Your tutor indicates the free alternative wherever one exists.

A SEIUM Institute certificate, awarded on passing the continuous assessment and the final project. It is SEIUM's own qualification, not an official state degree; its recognition depends on the programme completed and the regulations of each country.

Yes. Modules passed are recognised in a higher programme in the same area (postgraduate diploma or master's). Ask about the recognition policy when you enrol.

No prior qualification is required; you need an internet connection, a computer able to run the programme software and English sufficient to read technical standards.

Start dates are set by SEIUM's faculty for each intake. Our admissions team will confirm the next available date when you apply.

Activated Sludge Plant Operation CourseEnrol
Scroll to Top
SEIUM – Institute of Advanced Engineering
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.